| The existing facility
will be almost double the existing space (235,000 sf). It is designed
to match the growing campus's new identity., and features a high-density
automated storage and retrieval system. A single masted storage
retrieval machine, controlled by an on-line computer integrated
with the library’s computer system will maintain storage
of 50% of the 1,200,000 volume collection. The estimated construction
budget for the project facility is $17,400,000, with construction
due to begin in 2004. |